ACML at SIREXE 2026·November 18–22, 2026
Our documents, right at your fingertips.
Our mining services capabilities, track record and commitments: read our documents right here, in English or French.
Documents to read
All of ACML,
in 4 documents.
Tap a document to read it right here, in English or French: nothing to download, no app to install.
Our mine-site services
From ground to ore body,
we open the way.
An Ivorian earthworks and civil engineering contractor for mine construction and operations, ACML supports every phase of the mine life cycle.
50+owned heavy plant unitsFleet register, Sept 2026; more hired as required, Komatsu and Sany partnership
343,318BCM of ore haulageContracted on an operating gold mine
+3 M m³of specialised earthworksStripping, TSF, waste cells, dams
12 kmof new haul roadBuilt in 6 months
- Phase 1 delivered in under 12 months vs 15 planned
- Zero safety incidents reported, January – July 2026
- Mobilisation within 5 days of contract signature
Source: ACML company documents, October 2026.
Meet us
SIREXE 2026
The International Exhibition of Extractive Resources and Energy
“Extractive and energy industries: what infrastructure is needed to support economic development in Africa?”
- November 18–22, 2026
- Parc des Expositions, Abidjan

