Proven performance
On a producing gold mine, phase 1 of the ore haulage was delivered in under 12 months instead of the 15 planned; phase 2 was awarded in 2026.
An Ivorian earthworks and civil engineering contractor, serving mine construction and operations since 2018.

ACML Construction & Ingénierie is a public limited company (société anonyme) under Ivorian law, registered in Abidjan on 4 April 2018. Its management and decision-making centre are in Côte d’Ivoire.
An earthworks and civil engineering contractor serving mine construction and operations, ACML is organised around three production lines: mining services, irrigation schemes, and large industrial earthworks and civil engineering.
What our clients see in the field, according to our references and contracts.
On a producing gold mine, phase 1 of the ore haulage was delivered in under 12 months instead of the 15 planned; phase 2 was awarded in 2026.
Signed HSE policy, site HSE plan approved by the main mining contractor, zero safety incidents reported from January to July 2026.
A single point of contact at senior management level for the whole project, and decisions within 24 hours.
Mining production falls under the Equipment & Mining Department: fleet, maintenance and logistics report to a single manager. QHSE reports directly to the Managing Director, given its strategic importance.
Our accounts are certified by the statutory auditors BDO (principal) and G-Conseils (alternate). ACML is a member of GPMCI (the Ivorian mining professional association), GIBTP and EUROCHAM Côte d’Ivoire.